T-41 and T-131 at RDD 8-7-2014 T-41 at RDD 8-7-2014 T-41 landing at RDD 8-7-2014 T-41 landing at RDD 8-7-2014 Seen from the rear with the speed brakes deployed, is T-41 landing at RDD, 8-7-2014
All photos were taken by Bill Gabbert and are subject to copyright.
Comments
2 Comments
Chris Matthews
It looks like there are two retardant openings in the belly: one forward and one aft of the main landing gear. Is this correct? When loading, do they hook up hoses in two locations (within the painted red zones) or is there an internal connecting pipe that allows for one loading hose to fill the entire tank?
2 Comments
It looks like there are two retardant openings in the belly: one forward and one aft of the main landing gear. Is this correct? When loading, do they hook up hoses in two locations (within the painted red zones) or is there an internal connecting pipe that allows for one loading hose to fill the entire tank?
One hose, one tank, 2 nozzles, works really well.
Comments are closed for this article!